The time period required for the removal and installation of a new kitchen is between one to four weeks. However, it may differ if you have a big culinary area and materials like granite that take more time to be fitted properly.
Investing in expert kitchen fitting can provide different benefits, such as:
  • Increased Property Value
  • Long-term Investment
  • Personalised Design
  • Environmental Benefits
  • Improved Efficiency
  • Reduced Maintenance
  • Seamless Integration
  • Enhanced Aesthetics
The key working order for installing a kitchen includes:
  • Planning and design
  • Kitchen removal if required
  • Structural work
  • Wall and ceiling preparation
  • Flooring and cabinet installation
  • Worktop
  • Second fix utilities and appliance installation
  • Tiling and wall finishes
  • Final touches
The cost of kitchen fitting can be varied based on size and layout intricacy, material quality, appliance choices, labour rates and your location.